Renovation

Information about major library renovation projects.

A large brick building seen from above.
A recent photo of the main library under renovation, viewed from the northwest. Here, the new clerestory can be seen on the roof, and construction is underway on the stairs and terrace that will lead to the new north entrance to the building.

The reopening of the new main library, Alderman, is just under a year away, but Beth Blanton, Director of Collections, is already deep in the process of mapping the book move into the new space. “I realized I have more than 50 spreadsheets — I stopped counting — keeping track of the collections in the book move,” she said, reflecting on a process that directly involves more than a dozen Library staff members and will touch more than a million printed books.

A massive crane lifts a metal structure up and over a rectangular building which is partially under construction
UVA photographer Dan Addison captured exciting moments in October, as a crew installed massive skylights over the new library’s indoor atria.

 

University and Library personnel and construction workers and contractors gathered yesterday for a "topping-out ceremony" for the library renovation. The topping-out is when the last beam is placed atop a structure, and is a traditional milestone in a major construction project.

Guest post by: Kennedy Castillo (UVA Linguistics MA, 2019), Lise Dobrin (UVA Associate Professor of Anthropology and Linguistics Program Director), Liam Donohue (UVA Anthropology and Environmental Science BA, 2019), Grace East (UVA Anthropology PhD Candidate), Edith Kachia (Visiting Fulbright Swahili TA, 2018-19), Jenny Lee (UVA English and American Studies BA, 2019), Dakota Marsh (UVA English BA, 2020), Jacob Nelson (UVA Linguistics BA, 2020), Will Norton (UVA Linguistics BA, 2020)

The renovated space includes flexible areas for individual and group study and research throughout the building, as well as new elevators, bathrooms, and stairwells, and all-new mechanical infrastructure.